Project Overview

New construction under tight timelines requires specialized flooring solutions. This project involved the construction of a new, small drive-through coffee shop. The building contractor needed a flooring system that integrated seamlessly into a high-pressure schedule, ensuring that subsequent trades—including electricians, plumbers, and cabinet makers—could complete their work without delays or encumbrances. Concurrently, the building owner required a highly durable, low-maintenance floor capable of withstanding heavy daily operations.

The system selected was an acrylic with enhanced methyl methacrylate monomer (MMA). Unlike rigid alternatives, this MMA system retains flexibility, meaning it will never become brittle enough to crack or crumble. It also features exceptional UV stability, ensuring it will not discolor when exposed to intense sunlight through the storefront windows. When properly installed and maintained, this flooring is durable enough to outlast the building itself. To deliver both maximum durability and aesthetic appeal, the system was paired with a quartz aggregate broadcast, creating a floor that is visually striking and literally as tough as stone.

The Challenge

The coffee shop structure was under roof, but the site lacked electricity, the parking lot was unpaved, and the surrounding terrain was deep mud. The only stable surface was a small concrete landing outside. This environment created a high risk of site contamination, which could easily ruin a fresh floor installation.

All tools, supplies, and heavy equipment had to be forklifted over the muddy terrain onto the job site. Because the electrical crew was scheduled to begin work in exactly 48 hours, there was no room for error. MMA flooring was an advantage for its rapid-cure profile, allowing the installation team to complete the entire multi-layer system and leave behind a fully cured, operational floor within a strict two-day window.

Phase 1: Day 1 — Concrete Preparation & Detail Work

To maintain the tight construction schedule, the installation team completed all mechanical surface preparation, cove installation, drain detailing, and priming on the first day.

  • Mechanical Surface Profiling: While shot-blasting is the industry baseline for surface preparation, the installer utilized a dual-action approach for maximum adhesion. The concrete was first scarified and then shot-blasted to achieve an aggressive surface profile, optimizing mechanical bond strength.
  • Drain Detailing: The areas surrounding the floor drains were ground down and pitched with a specialized polymer mortar to guarantee consistent, positive drainage.
  • Priming & Cove Installation: After a thorough vacuuming to remove all dust, a premium two-part methacrylate resin primer was applied to the floor and the vertical coves. Once the primer cured, cove base strips were anchored. The installation team then mixed a heavy-duty MMA cove paste with quartz filler and hand-troweled the cove base.

Phase 2: Day 2 — Flooring Application & Topcoat

Day 2 focused on the application of the body coat, aggregate broadcast, and protective topcoats.

  • Masking & Base Prep: The floor drain covers were meticulously masked off with cardboard, and the cured coves were smoothed down using rub bricks to eliminate any imperfections.
  • Body Coat Application: The body coat—a methacrylic resin binder specifically formulated for wet food-service environments—was mixed and poured. Installers distributed the resin evenly using a 1/8-inch cam rake, followed immediately by a spiked roller to settle the mixture, reduce surface tension, and release trapped air bubbles.
  • Quartz Broadcast: Colored quartz aggregate was broadcast by hand into the wet resin until rejection (completely covering the liquid binder). Thanks to the rapid chemical cure of the MMA resin, the installers were able to sweep and blow off the excess, unbonded quartz aggregate within an hour.
  • Topcoat Application: To seal the system, two coats of a highly chemical-resistant, high-hardness methacrylic topcoat were rolled out using 18-inch and 4-inch rollers with a 3/8-inch nap. Chip brushes were used to detail the coves.

Project Results

By the time the installation tools and equipment were forklifted back across the mud to the staging area, the final topcoat had already achieved a full cure. The team immediately installed heavy-duty Floor Protection Board with seaming tape over the new surface. This allowed the incoming trades to begin their work on schedule without risking damage to the pristine floor.

The coffee shop now features a nearly indestructible, UV-impervious flooring system that meets rigorous sanitary standards and requires only minimal maintenance to last for decades.

Material, Equipment, and Installation Support

  • For Material & Equipment Support: If you are planning a similar facility upgrade, TSS Supply in Memphis, TN, stocks a complete line of premium resinous products, application tools, and industrial surface preparation rental equipment required to execute professional-grade flooring systems.
  • For Professional Installation: If your project demands an elite installation crew capable of delivering perfect safety compliance markings on time and on budget, IA Solutions is your premier regional industrial flooring contractor.

By your Side

Expert support when you need to keep your project on track. Monday through Friday 7am to 5pm CT

Visit Our Store

Locate our store carrying our products for quick and easy access. We have a huge inventory available for pickup. Store Hours Monday Through Friday 7am - 5pm CT

How can we Help?

Get answers, tips, and assistance from our knowledgeable team.

Get a Quote

Or ask any question!